Link to contact us   Contact us Link to more about the R T A   About us Link to a list of websites related to the R T A   Related websites Link to a map of the website   Sitemap
Project design
Sapphire to Woolgoolga upgrade > Project design

Project design

Design refinements

The current concept for the upgrade is shown in the environmental assessment documentation (click on the Public information page) . Many of the features of the concept design that have been developed and refined following community consultation and field investigations are identified on the plans. Further refinements to the current concept design may occur in response to community and stakeholder comments. The main features of the concept design are as follows.

Highway access arrangements

An access strategy has been developed for the upgrade. Under the strategy, provision would be made for grade-separated interchanges at the following locations:

  • Gaudrons Road/Split Solitary Road, Sapphire.
  • Moonee Beach Road/Hoys Road, Moonee Beach.
  • Fiddaman Road/Graham Drive South, Emerald Beach.
  • Graham Drive North, Woolgoolga.
  • Arrawarra Beach Road, Arrawarra.

Local roads and property accesses

The proposal includes local roads linking the above interchanges to:

  • Provide safer access to properties that currently have direct highway access.
  • Enable residents to take road trips to local schools and shops without having to use the highway.
  • Provide a continuous alternative local road link between Sapphire and Woolgoolga for school buses and motorists who do not wish to use the highway.


The concept design includes details of property access arrangements – especially in the Unwins and Newmans Road areas near Woolgoolga.

Rest areas

The Arrawarra interchange allows for the installation of rest areas for both light and heavy vehicles.

Opportunities to stage construction

There are a number of opportunities to stage the construction of the upgrade. They include:

  • Construction of the grade-separated interchanges ahead of the dual carriageways.
  • Construction of the dual carriageway upgrade in distinct sections (eg. Sapphire to Moonee Beach, Moonee Beach to South Woolgoolga and the Woolgoolga bypass).
  • Construction of the dual carriageway upgrade without the local roads, or with limited local roads.

 

At this time no decision has been made in regard to staging the construction of the project.

 


Back to top

Terms of Use | Online Privacy Policy | Disclaimer