Coutt's Crossing Bridge, Australia
The groundbreaking design for Coutt's Crossing Bridge in NSW, completed in association with Wagners CFT, features the first fibre composite deck in a public road bridge in Australia.
Replacing a 12 m span of the existing bridge, this lightweight solution integrated conventional bridge engineering materials with advanced fibre composite technology originally developed for aerospace and maritime applications.
< BACK TO INDEX